/  KME Mansfeld GmbH

KME Mansfeld GmbH

Customer

KME Mansfeld GmbH

Location

Hettstedt

Application

Slitting and cut-to-length shears Application for copper strips with a thickness of 1-6 mm

Control technology

S7-1517, WinCC 8.0

Drive technology

Approx. 50 Masterdrive drives, SINAMICS DCM in combination with a CU320-2PN as CU technology

Special requirements

High engineering effort in a short time - collaboration of 5 engineers on one project. Merging several control systems.

Scope of delivery

Engineering, switchgear construction, assembly and commissioning

Year of implementation

2025/2026

Inquiry about the project

Do you have questions about the project or an application? Contact us - we will be happy to talk about your project.

FEST GmbH modernized the automation and control technology of a more than 20-year-old slitting and cut-to-length line for KME Mansfeld GmbH. The plant had originally been set up by several different system houses, which led to a complex and in parts contradictory control architecture. The basis of the project was therefore a detailed analysis of the existing system in order to fully record the functions and transfer them to a modern, robust control structure.

The following measures were implemented as part of the conversion:

  • Replacement of three Siemens S5 systems, a Siemens Simadyn controller and an Allen Bradley Reliance controller
  • Construction of a new automation architecture based on two Siemens S7-1500 CPUs – separated into control and regulation units
  • Introduction of an up-to-date visualization solution by migrating from FactoryLink to WinCC 8.0
  • Systematic transfer of functions from the old network to a consistent, maintenance-friendly structure

 

The project was characterized by special challenges:

  • Complex system analysis: The heterogeneous old system required in-depth reverse engineering of the control logic and interfaces
  • High integration requirements: The large number of different systems had to be transferred error-free into a standardized Siemens architecture
  • Very short project planning phase: the entire technical planning was completed in just three months

 

Despite the tight time frame, the project was successfully implemented. A careful and precise preliminary analysis, continuous communication with the customer, smooth installation and commissioning as well as a cooperative partnership between all parties involved were decisive for this.

The modernized automation technology increases system availability, simplifies service and maintenance and creates a sustainable basis for future expansions.