Vienna / Austria
A greenelectrolyzer was built at the Simmering site on behalf of Wiener Wasserstoff GmbH for Wiener Stadtwerke, Wien Energie and Wiener Netze. This container-based and therefore space-saving 3MW electrolysis plant can produce around 1,300 kg of hydrogen per day. Climate neutrality by 2040 – the City of Vienna has set itself this ambitious goal. With its own green hydrogen production, Wiener Wasserstoff GmbH is taking an important step towards achieving this goal.
The hydrogen is used in the mobility sector with a hydrogen filling station operated by our sister company Maximator Hydrogen for refueling primarily buses and trucks. Wien Energie also uses the green hydrogen in its own power plant fleet and makes it available to industrial partners.
With the exception of the dry cooler and the refrigeration system, all the components and parts of the greenelectrolyzer required for the process are installed in two 40-foot containers to save space, resulting in a very high degree of prefabrication and reducing the assembly time on site to a minimum.
Customer
Wiener Wasserstoff GmbH
Location
Vienna, Austria
Application
Energy source and fuel for city buses with fuel cell electric drive
Product
gEL 600
Performance
3 MW, 600 Nm3/h
Commissioning
April 2024
Do you have questions about the project or an application? Contact us - we will be happy to talk about your project.
FEST developed the project together with us as equals. That’s why we now have a system that has worked right from the start. We are very grateful that FEST supplied us with such a mature product.
You need to load content from reCAPTCHA to submit the form. Please note that doing so will share data with third-party providers.
More InformationYou are currently viewing a placeholder content from Google Maps. To access the actual content, click the button below. Please note that doing so will share data with third-party providers.
More Information